Projects

Malta Survey

Geomara was commissioned by the Environment and Resources Authority (ERA), Malta, to undertake a bathymetric survey. Bathymetry was acquired using a Kongsberg 710 MKII Multibeam Echosounder System (MBES). The survey consisted of 5 areas with water depths varying from -186 to -1192m. The total surveyed kilometers for the project were 2980 km.

more

Ghana MTK Engineering

Geomara were contacted by MTK Engineering In Ghana in order to conduct reprocessing of some crucial bathymetric survey data. MTK Engineering also looked to Geomara to provide quality analysis of the data and also to provide an answer for the slight nonalignment between two different datasets.

more

Offshore Wind Farm Surveys

Geomara has been contracted by E.ON Climate and Renewables Uk to undertake multiannual bathymetric and geophysical surveys condition surveys at their fleet of Offshore Windfarms. Geomara has completed full condition surveys at Robin Rigg wind farm. The Robin Rigg Windfarm is located offshore from Whitehaven; approximately 12 km in the Solway Firth and consists of 58 x 3 MW turbines and two offshore substations.

more